A Scheduling Problem in Wire Industry - Bog af Noyan Z Mb LC & Noyan Zumbulcu - Paperback
In this book, properties and scheduling constraints of copper-wire production and scheduling problem are analysed. This problem can be decomposed into three main sections. Based on these sections, properties of the problem and the objective function within a mathematical model are defined and scheduling heuristics to cover both the multi-wire and bunching stages are demonstrated. In multi-wire stage, after acquiring an initial solution with simulated annealing technique, a scheduling solution is..